Quantcast
Channel: SCN : Unanswered Discussions - Supply Chain Management (SAP SCM)
Viewing all articles
Browse latest Browse all 5579

Material master IM

$
0
0

Hi All,

 

We are seeing an issue with the ATP checking horizon in APO. As per my understanding, the Material master Integration Model should update the ATP checking horizon with the Total replenishment lead time for an in-house product.

In our case, if I change the ATP checking horizon manually in APO to a different value, after running the Material Master Integration model, I do not see the ECC replenishment lead time in APO. I have checked and the material does exist in the active IM and there are no CIF issues encountered.

Shouldn't the IM overwrite the manually entered value in APO with the ECC value for replenishment lead time?

 

Regards


Viewing all articles
Browse latest Browse all 5579

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>