SNP run clarification

$
0
0

Dear Team

I wish I explain to my   operators’, planners  and shop floor supervisor’s  about SDP94 in detail –on what these individual entities mean ? and what those  data’s are meant for ? and where do they come from ?  like is it manually entered  or system generated  or if it is coming from ECC.

  Even before stepping into shop floor I would like to cross check with you to be sure -if what I am going to say carries meaning. I have made a tabular column of screen entities of SNP94 and tried to give a correct answer as much as possible, I wish your help  in bringing about the apt answer in the tabular column ,corrections if any in the tabular column  are most welcome

 

gs1.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SNP Plan/Technical language of SDP94

What this data means ? explained in terms of layman's language or Operator’s language

and where it comes from

(manually entered or system suggested or it is coming from ECC ) ? 

 

 

 

Forecast

The aniticipated demand for the next 3 months based on our past demand

manual

Sales order

Orders that come from our global customers  and domestic customers(manual entry)

manual

Distribution demand(planned)

FERT material to be distributed along the W/C as per planned order(system suggestion)

system suggestion

Distribution demand (confirmed)

FERT material to be distributed along the W/C as per confirmed planned order(system suggestion)

system suggestion

Distribution demand (tlb confirmed)

I don’t know

No idea

Total demand

Summation of all above demands (system suggestion)

system suggestion

Distribution receipt(planned)

Quantities planned from Planned production order

system suggestion

Distribution receipt(confirmed)

Quantities planned from Planned confirmed )production order

system suggestion

Distribution receipt(TLB confirmed)

 

 

In transit

Quantities planned  that is arriving on trucks

 

Production (planned)

Quantities planned from Planned production order(system suggestion)

 

Production (confirmed)

Quantities arrived from Planned production order(system suggestion)

 

Manufacture of co-products

 

 

Total receipts

Total planned quantities

 

Stock on hand

Physical stock that comes from ECC (MMBE)

 

Supply shortage

Deficit  quantities that needs to be filled up by planned orders (system suggestion or manual suggestion)

 

Safety stock(planned)

Threshold level of stock to be maintained(manual suggestion )

 

Safety days supply

 

 

Safety stock

Defined in ECC will reflect in this field

 

Reorder point

Defined in ECC will reflect in this field

 

Target days supply

 

system suggestion

Target stock level

 

system suggestion

Days supply

 

system suggestion

ATD Receipts

 

system suggestion

ATD issues

 

 