We are on SCM 7.02 with EHP2.
We are using standard SAP SNP subcontracting functionality in our ECC
& SCM system. When we run SNP heuristics at the plant, system generates planned
orders at SUBC vendor location as Production (Subcontracting Planned) item
category ES - SNP: Planned Order (Subcontracting).
When we try to run SNP heuristic Capacity leveling with capacity
overloaded, system is not capacity leveling across the periods.
But SNP Heuristic Capacity leveling works with EE - SNP: Planned order Type.
Anyone had experienced the same?