Hello,
We are in the process of testing the activation of Parallel BOP on our QAS system, and it is not working.
As the Basis guy, I have been asked to figure out what is wrong, I have therefore checked the configuration reviewed the online help and the configuration steps described in SPRO ; everything seems to be fine, ... but still BOP step is executed serially, for some unknown reason
We are running a SAP SCM release not too old : SAP SCM 7.02 SPS3 , I have detailed below the configuration steps, as well as the runtime statistics.
Image may be NSFW.
Clik here to view.
Profile PARALLEL has been defined, and our goal is the activate Parallel Processing only for the Check step. As I understand it, the mimimum number of parallel job should be 2.
Image may be NSFW.
Clik here to view.
Server group BOP exists and is active
Image may be NSFW.
Clik here to view.
RFC Server Group BOP exists and is active
Image may be NSFW.
Clik here to view.
Parallelization is checked when running BOP Processing
Image may be NSFW.
Clik here to view.
Still the Check Step is processed serially
Image may be NSFW.
Clik here to view.
The system recognize that Parallel BOP option has been selected
Image may be NSFW.
Clik here to view.
And the number of Items should allow the Step "Check" to be processed in parallel.
I really do not understand what is missing.
Any help/input would be appreciated.
Thanks and Regards