Hi All,
I faced a system error message"An invalid mode priority was specified for a mode" when I create a plan order in APO with PDS .
The PDS is only one activity/mode and the mode priority is blank.
After I maintained the mode priority, it worked.
Is that mean, even I don't have other mode, I should maintain the mode priority?
Thanks.