One issue regarding PPDS OP.confirmation from Legal Non-SAP system

$
0
0

Dear Experts

we met a BAPI function issue regarding PPDS Operation.confirmation from Legal Non-SAP system.

scenario is as following:

we want to build the interface between PPDS and non-SAP system, regarding OP. and order confirmation inbound processing.

now we input simulated inbound date and test using BAPI: BAPI_MOSRVAPS_CONFOPRMULTI

but we find a problem, even we set different value for fields ‘ duration’ in function. after call BAPI, It didn't reflect the 'net duration' or 'remaining duration', these fields not changed through check in Tcode:/SAPAPO/RRP3 for single operation.

 

In the meanwhile , but it works for fields 'confirmed Yield' and fields 'confirmed Scrap' for single operation.

 

my questions is that: if we need to synchronize the operation confirmation( including confirmed yield,confirmation scrap, duration),do we use the correct BAPI for this or do we need an additional BAPI, please hints.

 

Thanks a lot! any feedback would be welcome!

 

Best Regards

Kevin