Hi All
i got a problem,when i update the schedule line of Purchase order,it didn't trigger the CIF process。so the schedule line data were still old one in APO。my operation is below:
1. tcode: me22n to change a PO
2. insert a new schedule line,line number is 2
3. then delete the schedule line 1。
usually,if i just insert a new line or delete a schedule line, it will trigger the synchronization,and the data in APO will be updated。But, when I combine both operation,nothing happen。line 1 is still in APO,line 2 is not exist。
Even I run the CFM1,CFM2 and RIMODINI,it only update the line 2 to APO,but line 1 is still exist。So I have to run the CCR all the time,or it will make a wrong forecast。 doesn't anyone know what happen and how to figure it out ? thanks !!