Hi Forum,
My question is relatively simple and I have been surprised not to find the answer myself with Google searches but:
If I had a capacity overload at week10 (for example) and my key settings are: Heuristics levelling, backwards then forwards..would it only look to move into week 9, then if not possible week 11? or will it look at week 9, then week 8, then week 7 etc..
Is there a way to control the extent at how far 'backwards and forwards it looks? If there is no control is it feasible that a overload in week 100 could be moved to week 4 (assuming al the other master data and settings allow this and its the first spare space)