Hello All,
We are doing system copy of APO from production to quality about every 6 months and it always goes successful.
this time the same method has been used. DB Backup/restore. we have followed all the post-steps (BW system copy/APO system copy/live cache system copy) and they all went fine. system is up and running. but somehow. all the planning areas are in red. inactive.
Please let me know how to start and where to start. if i will activate, the data will be lost.
OM17/OM03 all checks shows every thing green.
BR
Samirr Desai.