Dear experts,
Please advice regarding the following situation. I execute the Production Planning Run. After this, I check the log and I get the following error : "Recursion in planning run: product T-B104 location PL1000 to be planned twice". Based on previous posts regarding similar situations, I run the trx. /SAPAPO/SNPLLC to identify the existing cycles resulting in the recursion of the planning run. After this, in the log I have the following error: "no supply sources were found for the model 000".
Does anybody have a clue regarding the cause of this ?
Thank you,