Hi Gurus,
Scenario: I am running SNP heuristics to generate production plan at plane level. before making the same I made GR time for that SKU_Plant combination "0" to ensure start date and end date of production plan generation should be same and also made SNP checking horizon for eg. 5 days to ensure PP should generate on 6th day.
Result: PP is generating within SNP checking horizon i.e PP is seating on 4th day which I don't want.
Please suggest what settings to be maintained for my desired result.
Thanks
Prasanta