Account Assignment in Multiple Output Planning in PPDS

$
0
0

Hi,

 

I activated MOP. Manually creating the MOP order with heuristic SAP_MOP_002.

 

When I am manually creating the MOP order, then the total order quantity of the sales orders are getting combined and MOP order is created for the total requirement and the complete quantity is getting assigned to the first sales order as per sorting.

 

I want individual account assignment for each sales order requirement in the MOP order.

 

E.g.:

 

Material: 123

 

Sales order A = 100 KG

 

Sales Order B = 200 KG

 

Sales Order C = 300 KG

 

In my case, MOP order is getting created with only one output receipt (material 123) of 600 KG and the total quantity (600 KG) is getting assigned to sales order A.

 


My requirement:

 

One MOP order with 3 output node of same material 123 with respective account assignments.

 

Total MOP order quantity = 600 KG

Materail 123   100 KG   Sales order A

Material 123   200 KG   Sales order B

Material 123   300 KG   Sales order C

 

I think with the methode /SAPAPO/IF_EX_EOG_ADDIN1~ACCID_CONTROLS this is possible.

 

Can anyone provide me any sample code, what and how to influence?

 

Or there is any other way (Badi, Configuration...etc.) to achieve my requirement.

 

Thanks in advance.

 

Warm Regards,

Surajit Das